What Is a Power Grid Worth? Pricing the €9.5bn Bet on TenneT Germany

An outside-in returns model of APG, GIC and NBIM's equity commitment to TenneT Germany: roughly an 8% return if the grid can be sold at the multiple they paid, and a price that only works because the money funds the capex plan.

How a long-term investor decides what to pay for a regulated grid, rebuilt from public numbers. The full Excel model is free to download at the end.


Where this started#

When I worked at APG, I wanted to move into the asset management side of the house, so I spent a lot of time with a colleague there. He would walk me through how they looked at acquisitions: not “what is this company worth” in the abstract, but “what is the most we can pay and still earn the return our pensioners need”. That question was more interesting to me than anything I was doing at the time, and I built my own model to understand it.

In September 2025 APG, together with Singapore’s GIC and Norway’s NBIM, agreed to put up to €9.5 billion of equity into TenneT Germany for a combined 46% stake. It is a public deal with public numbers, so it is a good one to rebuild that way of thinking on. Everything below comes from press releases and annual results; every assumption is mine and is labelled as such in the workbook.

1. The deal in five numbers#

Enterprise value (cash and debt free)€40bn
Pre-money equity value, 31 Dec 2025€10.4bn
Equity committed by APG, GIC and NBIM€9.5bn, paid in from June 2026 to 2029
Stake on completion46% (KfW later took 25.1%; TenneT keeps 28.9%)
Regulated asset base (RAB), end 2025€36.8bn, so EV/RAB ≈ 1.09x

The detail that matters most: this is a capital increase. The €9.5bn does not go to the Dutch state as a seller; it goes into TenneT Germany to pay for the grid. TenneT invested €10bn in Germany in 2025 alone and plans around €13bn a year to 2030.

2. How a regulated grid makes money#

A grid operator in Germany does not set its own prices. The regulator (the Bundesnetzagentur) allows it to earn a return on its regulated asset base: roughly, what it has invested in the grid, less depreciation. So the whole valuation hangs on one loop:

  1. Invest → the RAB grows.
  2. The RAB earns an allowed return → profit.
  3. Profit pays interest and tax; what is left belongs to shareholders.
  4. If investment outruns profit, shareholders have to put more money in.

In 2025 TenneT Germany earned an underlying EBIT of €1.57bn on an average RAB of about €32bn: a return of about 4.9%. I keep that for the current regulatory period and nudge it to 5.2% from 2029, when the regulator moves to a new WACC-based method. That uplift is my assumption, not a published number.

3. From the grid to the investor#

The model rolls the RAB forward year by year: capex in, depreciation out over a 40-year asset life. On top of it sits a simple income statement (EBIT, interest at 3.5% on net debt, 30% tax) and a debt policy. TenneT Germany starts very geared, with net debt around 80% of RAB, so I let that glide to 65% by 2033.

That gives free cash flow to equity each year. For the first eight years it is negative: the grid is growing faster than its earnings can fund. The first useful check is whether the announced equity covers that hole:

2026–2029€bn
Equity the business needs (model)11.9
Committed: consortium €9.5bn + KfW €2.3bn11.8

Near enough to say the funding package was sized to the capex plan, which is reassuring for both the model and the deal.

From the consortium’s side the cash flows are: pay in the €9.5bn to 2029, then fund or receive 46% of the free cash flow, then sell the stake in 2040 at some multiple of RAB. The grid is three times bigger by then, so the exit is the single largest cash flow by far.

4. Results#

Base case: exit in 2040 at the same 1.09x EV/RAB that was paid.

IRR8.3%
Money multiple2.4x
Maximum bid for 46% at a 7.5% required return€10.6bn
Price paid€9.5bn

The maximum bid is how I understood my colleague’s question: the price at which the deal earns exactly the required return. Above it, you walk away. It is calculated as the present value of everything you get back divided by the present value of one euro paid in on the same schedule.

The exit multiple drives almost everything:

Exit EV/RAB0.9x1.0x1.09x1.2x1.3x1.4x
IRR3.9%6.4%8.3%10.1%11.5%12.7%

And the maximum bid moves with the return the investor demands:

Required return6.0%7.0%7.5%8.0%9.0%
Max bid at 1.09x exit (€bn)13.111.410.69.98.5

So the deal clears any required return up to about 8%, provided the grid can be sold in fifteen years at roughly what was paid for it today.

5. Why only 1.09x?#

Regulated network deals elsewhere have priced much richer. In the US in 2025, Blackstone offered about 1.7x rate base for TXNM Energy, and KKR and PSP paid about 2.3x for a stake in AEP’s transmission business. TenneT Germany went for roughly half that. My three readings:

  1. The buyers are paying for growth they still have to fund. A primary injection into a business that needs €13bn a year is a different thing from buying a mature utility’s cash flows.
  2. German allowed returns are lower. The equity return on new assets in the current period is about 5% before tax; US allowed returns are typically higher.
  3. There were very few possible buyers. Writing a €9.5bn equity cheque is a club of a handful of investors worldwide, and the existing owner, a state-owned group, needed the funding.

If I were on the deal team, the due-diligence questions I would push on are exactly the ones the model is most sensitive to: what the regulator will allow from 2029, whether the capex plan can be delivered on budget, and who could buy a stake this size in 2040.

6. What this model is not#

It is an outside-in sketch, not APG’s model. Real investors model each regulatory period in detail, include the timing lag between investment and allowed revenue, and run many more scenarios. The point here is the logic: the return you need sets the price you can pay, and the exit sets the return.

Download the model: TenneT_Germany_Returns_Model.xlsx (Excel, live formulas, every input on one sheet and sourced).

Sources: TenneT and GIC press release (24 September 2025); APG press release; TenneT Germany FY2025 results and completion announcement (July 2026); Bundesnetzagentur decisions on equity returns; First Sentier Investors on US regulated-utility transactions. Links are in the workbook.